Skip to content

Digital infrastructure for engineering projects

From drawing to delivery — one engineering workflow.

Tecyro connects design, calculation, specification, procurement and logistics in one project environment — for installers, engineering companies, manufacturers and suppliers.

One ProjectOne SpecificationOne Order

Example Tecyro project: a calculated riser diagram for a four-storey building with cold and hot water supply, specification lines with prices and availability, and a proposal approved by the client and ready to order.

Riverside Terrace

Water supply · 4 floors · 12 apartments

Riser diagram Cold Hot
Specification v346 lines
  • PE-Xa pipe Ø25 × 3.596 m£307.20
  • Riser manifold, 4-way12 pcs£1,188.00
  • Indirect cylinder 300 l1 pc£1,460.00
  • Pressure reducing valve DN321 pc£118.50
Total ex. VAT£24,816.40
Proposal approvedCreate order

The workflow

Seven steps. One continuous project record.

One ProjectOne SpecificationOne Order

  1. 01Design

    Building data from forms, AI or drawings

  2. 02Calculate

    Deterministic, traceable engineering

  3. 03Specify

    BOM, cost estimate and proposal

  4. 04Select

    Compatible products, compared

  5. 05Order

    One order across many suppliers

  6. 06Deliver

    Sequenced by construction stage

  7. 07Install

    The right parts on site, on time

Platform

Two layers. One system.

A scalable software platform, and local operations that turn approved specifications into delivered equipment. Each layer makes the other stronger.

Layer 01 · Software

Tecyro Software

A scalable platform for installers and engineering companies: every project, calculation, specification and order in one environment.

  • Projects
  • Engineering calculation
  • Product selection
  • Specification & proposals
  • Marketplace
  • Orders
  • Customer portal
  • CRM & reports

Layer 02 · Local operations

Tecyro Local Operations

Market-specific distribution, warehousing and logistics, built on the software and fed by real project demand.

  • Hybrid inventory tuned to each market
  • Deliveries sequenced by construction stage
  • Reference markets: United Kingdom and Türkiye
  • Franchise model for new markets
The commercial transaction is generated by the engineering workflow rather than added to it afterwards.
The Tecyro principle

How it works

From an empty project to equipment on site.

Six steps in one environment. Each step builds on the data of the previous one, so nothing is re-typed, re-quoted or lost between teams.

  1. One ProjectBuilding data, drawings and calculation runs
  2. One SpecificationBOM, cost estimate and approved proposal
  3. One OrderMany suppliers, staged deliveries
  1. 01

    Create the project

    Describe the building with structured forms, talk it through with the AI assistant, or upload drawings and let Tecyro recognise floors, units and draw-off points.

    • Structured forms
    • AI assistant
    • PDF · images · DWG/DXF
  2. 02

    Run the engineering calculation

    A deterministic engine sizes the system from the building data. Every run is versioned with its inputs, outputs and trace.

    AI never replaces the calculation engine.

    • Deterministic
    • Traceable runs
    • Warnings & checks
  3. 03

    Build the specification

    Results become a bill of materials, a cost estimate and a commercial proposal your customer can review and approve online.

    • Bill of materials
    • Cost estimate
    • Commercial proposal
  4. 04

    Select equipment

    Compatible products are compared by technical fit, price, availability and lead time — across manufacturers and suppliers.

    Swap the manufacturer without recalculating.

    • Technical fit
    • Price
    • Availability
    • Lead time
  5. 05

    Move to procurement

    The approved specification turns into one order across many suppliers through the Tecyro marketplace — prices and availability re-confirmed.

    • Marketplace
    • One order
    • Many suppliers
  6. 06

    Manage delivery

    Deliveries follow the construction sequence, so the site receives what it needs for the current stage — no earlier, no later.

    • 1Concealed components
    • 2Distribution
    • 3Heat generation
    • 4Controls

AI-assisted · engine-calculated

AI assists.
The engine decides.

Tecyro uses AI where it saves time — reading drawings and structuring a brief. Every number in a specification comes from a deterministic calculation engine.

  • Deterministic calculations

    Same inputs, same results. Engineering logic lives in a tested calculation engine — never in a language model.

  • Traceable runs

    Every run stores the module version, exact inputs, outputs, warnings and trace. Any figure in a proposal can be followed back to its source.

  • AI assistant & drawing recognition

    Describe a project in plain language or upload drawings. AI proposes structured building data; you review it and apply it.

  1. 01AI assistantproposes building data
  2. 02Engineerreviews and applies
  3. 03Enginecalculates, every time
calculation run #0142reproducible
module
water-supply
inputs
4 floors · 12 units · 86 outlets
fingerprint
9f3a…e21c
  • Passed:design flowQD 1.84 l/s
  • Passed:pipe sizing18 sections · Ø16–Ø40
  • Passed:pressure checkcritical outlet 1.62 bar
  • Warning:PRV requiredstatic 5.8 bar > 5.0 bar

→ 23 technical requirements sent to product selection

stored with inputs, outputs and trace

Ecosystem

One project record. Every participant.

Tecyro links everyone involved in an engineering project to the same data — so demand, supply and delivery finally line up.

One shared project record connects installers, engineering companies and end customers with manufacturers, suppliers and logistics.DEMANDSUPPLYtecyroproject recordInstallersEngineeringCustomersManufacturersSuppliersLogistics

Demand side

  • Installers

    Less fragmentation, one workflow.

    Design, calculate, specify and order without juggling spreadsheets, catalogues and supplier portals.

  • Engineering companies

    Visibility across the business.

    Customers, projects, employees and purchases in one place, with consistent engineering across every team.

  • End customers

    Transparency from proposal to handover.

    Review solutions, documents and project status — and approve proposals online.

Supply side

  • Manufacturers

    Demand visible at the specification stage.

    See which products are being specified on real projects — long before the purchase order arrives.

  • Suppliers

    Qualified demand from real projects.

    Receive orders that come from calculated, approved specifications instead of speculative enquiries.

  • Warehouse & logistics

    Confirmed orders, ready to move.

    Confirmed orders flow straight into procurement, picking and shipping — staged by construction phase.

Tools

Start with two tools today.

Available to every company account. Useful on day one — and the entry point into the full project workflow.

Live
Water supply · hot & cold
Next
Underfloor heating

House shell estimate

Instant
  • 12 × 10 m
  • 2 floors
  • Aerated block 300
  • Pitched roof
  • Strip foundation
  • Materials 58%
  • Works 31%
  • Machinery 11%
  • Walls34%
  • Roof24%
  • Slab21%
  • Foundation21%
Commercial proposal readyPDF

House shell cost calculator

Available after sign-in

An instant estimate for a house shell — walls, roof, slab and foundation — split into materials, works and machinery, with a commercial proposal ready to send.

  • Walls · roof · slab · foundation
  • Materials / works / machinery
  • Commercial proposal
ground-floor.dwg

Building recognised

5 rooms · 76 m² · 5 draw-off points

Bill of quantities

  • PE-Xa pipe Ø1664 m
  • Press fittings Ø1638 pcs
  • Manifold, 3-way2 pcs
  • Mixing valve (TMV)1 pc

Project recognition

Available after sign-in

Upload drawings and get building data, calculations and a bill of quantities — exactly what you need, and how much of it.

  • PDF · images · DWG/DXF
  • Building data
  • Bill of quantities

Tecyro Local Operations

Distribution that follows the build.

Market-specific distribution, warehousing and logistics, operated on the Tecyro platform and driven by confirmed project demand — not forecasts alone.

  • GBInitial

    United Kingdom

    Reference market

  • TRInitial

    Türkiye

    Reference market

  • +Next

    New markets

    Franchise model

Hybrid inventory

Stock what moves. Procure what is specific to the project.

  • Fast-movingHeld in local stock for immediate picking.
  • Medium-movingStocked selectively, replenished on demand.
  • Project-specificProcured against confirmed specifications.

Deliveries by construction stage

The site receives what the current stage needs — nothing early, nothing in the way.

  1. 1Concealed componentsDelivery 01Pipes, fittings and embedded parts — before walls and screeds close.
  2. 2DistributionDelivery 02Risers, manifolds and branch connections.
  3. 3Heat generationDelivery 03Boilers, heat pumps and hot-water cylinders.
  4. 4ControlsDelivery 04Thermostats, valves and commissioning kit.

Warehouse & logistics on the same record

Confirmed orders move to procurement, picking and shipping without re-entry.

  1. Confirmed order
  2. Procurement
  3. Picking
  4. Shipping
  5. On site

One ProjectOne SpecificationOne Order

Bring your next project onto Tecyro.

Create a company account and take your first project from building data to a confirmed order — in one environment.